Two quotations arrive for the same line pipe consignment. Both show the same headline price per tonne. One is FOB. The other is CIF.
They are not the same offer.
The FOB buyer still has to book the vessel, insure the cargo, and manage freight. The CIF buyer has freight and minimum insurance included, but the seller’s responsibility for the goods still ends once they are loaded at the port of shipment. Neither buyer has yet asked who handles import clearance, who pays for inspection, or where the risk sits if the cargo is damaged at sea.
Incoterms decide those questions. In oilfield supply into Africa and the GCC, where projects run on fixed schedules and port conditions vary, choosing the wrong term is a common and avoidable source of cost and dispute.
What Incoterms Do, and What They Do Not
Incoterms are the standard trade terms published by the International Chamber of Commerce. They define three things between buyer and seller: where delivery takes place and risk passes, who pays for which costs, and who is responsible for which documents and clearances.
The current edition remains Incoterms 2020, which includes eleven rules. The ICC has begun groundwork on the next revision, but no new edition has been published. Contracts should therefore state the rule, the named place, and the version, for example "FCA Shanghai, Incoterms 2020."
Incoterms do not transfer title to the goods, set payment terms, or replace the sales contract. They also do not decide who pays for third-party inspection unless the contract says so. This is one more reason to write the commercial terms explicitly.
The Terms That Matter Most in Oilfield Supply
| Term | Seller delivers | Who arranges main freight | Import clearance | Typical fit |
| EXW | At seller’s premises | Buyer | Buyer | Rarely suitable for export; buyer must handle loading and export clearance |
| FCA | To the buyer’s carrier at a named place | Buyer | Buyer | Containerised cargo; a clearer alternative to EXW |
| FOB | On board the vessel at the port of shipment | Buyer | Buyer | Break-bulk and bulk cargo where the buyer controls freight |
| CFR / CIF | On board at the port of shipment, with freight paid to destination port (CIF adds insurance) | Seller | Buyer | Buyers who want freight included but accept risk from loading |
| DAP | At the named destination, ready for unloading | Seller | Buyer | Buyers who want delivery to a specific location arranged for them |
| DPU | At the named destination, unloaded | Seller | Buyer | Same as DAP where unloading is also needed |
| DDP | At the named destination, import-cleared | Seller | Seller | Only where the seller can lawfully manage import clearance and duties |
FOB, CFR and CIF are for sea and inland waterway transport only. FCA, CPT, CIP, DAP, DPU and DDP work for any mode of transport.
Mistakes That Cause the Most Trouble
- Assuming CIF means the seller carries the risk to destination. It does not. Under CFR and CIF, risk passes when the goods are loaded on board at the port of shipment, even though the seller pays the freight. Under CIF, the seller’s default insurance obligation is also a minimum level of cover. Buyers who want broader protection for high-value tubulars should agree it explicitly.
- Using FOB for containerised cargo. Goods in containers are normally handed to a carrier at a terminal, not placed on board by the seller. For containers, FCA, CPT or CIP generally describe the actual handover more accurately than FOB, CFR or CIF.
- Accepting EXW for an export shipment. Under EXW the buyer must load the goods and clear them for export. For buyers without a presence in the country of origin, that is rarely practical. FCA usually gives the same price logic with clearer responsibility.
- Agreeing DDP without checking local rules. Under DDP the seller is responsible for import clearance and duties in the destination country. In many markets, import clearance requires a locally registered importer or specific permits. A seller who cannot actually do this should not accept the term.
- Leaving inspection costs undefined. A pre-shipment inspection requested by the buyer is generally the buyer’s cost unless the contract says otherwise. For projects that require third-party inspection, the contract should say who arranges it, who pays, and how the release certificate is handled.
Matching the Term to the Project
There is no universally best Incoterm. The right choice depends on who is best placed to manage each stage.
- Buyer with an established freight and clearance set-up. FCA or FOB keeps control with the buyer and often gives the most transparent price comparison between suppliers.
- Buyer who wants freight managed but keeps import clearance. CFR, CIF, CPT or CIP, with a clear understanding of where risk passes.
- Project team that wants delivery to a site or yard. DAP or DPU, with the destination, access and unloading arrangements clearly named.
- Landlocked or remote destinations. Use a term that names the actual delivery point, such as DAP at the inland destination, instead of a seaport term that leaves the last and riskiest leg undefined.
When comparing quotations, convert them to the same term first. Two prices on different Incoterms are not comparable until the freight, insurance and clearance differences are accounted for.
Where a Sourcing Partner Helps
In a supply chain that runs from a manufacturer through a sourcing partner to the end client, the Incoterm in each contract is a separate decision. The term between the mill and the sourcing partner may differ from the term between the sourcing partner and the client, and the two have to line up so that no stage is left uncovered.
ANZ Global Group’s role is to coordinate those stages: aligning the terms across the supply chain, working with freight partners, keeping the documentation consistent with the agreed term, and following the consignment to delivery. The term is agreed at the quotation stage, along with inspection and documentation requirements, so that the price quoted reflects what will actually be delivered.
A Short Checklist Before You Confirm an Order
- State the Incoterm, the named place, and the version in the contract.
- Confirm that the quotations you are comparing use the same term.
- Check where risk passes and whether the insurance cover is adequate for the goods.
- Confirm who handles export and import clearance, and whether that party is able to do so.
- Agree who arranges and pays for third-party inspection.
- For containerised or inland deliveries, use a term that matches how the goods actually move.
This post is general information and not legal advice. For high-value or complex contracts, have the final terms reviewed by a qualified trade or legal adviser.
Working With ANZ Global Group
ANZ Global Group LLC FZ is a Dubai-based industrial sourcing and supply company serving oil and gas, drilling, infrastructure, and advanced materials sectors across GCC, Africa, CIS, and international markets.
For sourcing inquiries, technical requirements, or project supply discussions, contact our team at:
- Email: info@anzglobalgroup.com
- UAE: +971 50794 4739
- India: +91 86799 58783
- USA: +1-301-915-0995
- Website: www.anzglobalgroup.com
Supplying Trust. Delivering Value.